"Public review" that closes before anyone reads it, merge reads as the green light. At the Nano Collective, every whitepaper sits 30 days after merge. Build call at the end, with rationale. Not vetting. The only window a good idea gets heard before code exists.
Daily X posts
2026-10-05
Generated 10/5/2026, 5:44:01 AM · minimax-m3